Decks + Hardscapes

Deck Builders Who Finish the Job at Ground Level

A deck that ends in a patch of mud at the bottom of the stairs is only half finished. Most backyards need hardscaping to tie a deck into the rest of the property: landings, walkways, steps on a slope and walls that level out usable space. This page is for homeowners looking for deck builders Ridgeland MS residents can hire for both pieces, so the structure and the ground work are designed together instead of by two different crews.

Rooftop deck with water tank and city skyline view

Where Deck Projects Usually Need Hardscape

  • Stair landings: a paver or concrete pad at the bottom of deck stairs keeps feet and furniture out of the mud
  • Walkways linking the deck to the driveway, garden or a side gate
  • Retaining walls where a sloped yard leaves no flat spot below the deck
  • Gravel or stone under low decks to discourage weeds and improve drainage
  • A lower patio for a fire pit, since open flame does not belong on a wood deck

Grading and Drainage Come First

Water that runs under a deck and pools against the foundation causes rot, mildew and settling. Before framing starts, we check how the yard drains and correct it with grading, a drainage layer beneath the deck or a channel drain along a patio edge. Getting this right is cheaper than fixing a soggy crawlspace later.

One Design, One Crew

When the deck and hardscape are planned together, the stair layout lines up with the walkway, the patio sits at the right height for a comfortable step down, and materials coordinate: composite decking in a color that complements the pavers, or stone that echoes the home's brick. It also means one point of contact and one schedule. Nearby, our hardscape wall projects around Gluckstadt and Ridgeland show what these combinations can look like.

Factors That Affect the Price

Every quote is itemized, and the biggest cost drivers are deck size and height, decking and railing material, the number of stairs, the length of walls and walkways, and how much grading the site needs. Retaining walls over a certain height may require engineering. We explain each line so you can adjust scope to fit a budget. More Ridgeland ideas are on our Ridgeland outdoor living page.

Common Questions

Why add hardscaping to a deck project?

It connects the deck to the yard, controls drainage and creates usable ground-level space for things like fire pits. It also keeps the area at the bottom of the stairs from wearing into mud.

How long does a deck plus hardscape project take?

Simple deck-and-landing projects may take about a week or two, while designs with retaining walls and long walkways take longer. Your estimate includes a schedule.

Which materials work well together?

Composite decking pairs nicely with concrete pavers or natural stone. We bring samples so you can see combinations side by side against your home.

Can you add hardscaping to a deck someone else built?

Yes. We inspect the existing deck first and point out any safety issues, then design landings, walkways or walls around it.

Plan the Deck and the Ground Around It

Schedule a free estimate and we will design your Ridgeland deck, steps and hardscape as one project.

Request Your Free Estimate

Call (662) 222-4277