1. Site Visit and Proposal
We inspect the roof and the interior, confirm the deck type and existing layers, and talk with you about how the building is used. The written proposal covers the system we recommend, insulation and drainage improvements, flashing and edge details, and any alternates. Workmanship and manufacturer warranties are explained in writing. If the building has drainage problems, this is when we plan tapered insulation or added drains so the new roof sheds water properly.
2. Scheduling and Preparation
Once you approve the work, we order materials and set a start window that accounts for weather and your calendar. Around a university town, that can mean avoiding move-in weeks or major event weekends. We confirm staging areas, dumpster placement and any equipment that must be shut down or moved.
3. Tear-Off and Dry-In
We remove only as much of the old roof as can be covered with new material the same day. Damaged decking is replaced as it is found, and we let you know if conditions differ from what the test cuts showed. Each section is sealed with a daily dry-in before the crew leaves so the building is protected overnight, even if a storm rolls through.
4. Installation, Details and Closeout
- New insulation and cover board installed and fastened to the deck
- Membrane or panels installed, with seams welded, taped or seamed per the system
- Flashings at walls, curbs, pipes and drains completed
- New edge metal and coping installed
- Final cleanup, magnetic sweep and a walkthrough with photos
For more on membrane choices, see our TPO and EPDM roofing page. Homeowners can find a similar step-by-step view on our Starkville roof installation page.
Common Questions
How long does a commercial re-roof take?
It depends on roof size, system, weather and how many details the roof has. Small buildings can be done in days, while larger roofs take longer. We give you an estimated schedule in the proposal.
What if you find rotted decking during tear-off?
We replace damaged decking as it is uncovered so the new roof has a solid base. The proposal explains how deck replacement is priced so there are no surprises.
Will rain delay the project?
It can. We watch the forecast closely and only open what can be dried in each day. Rain days may push the finish date, but the building stays protected.